Kitchen Remodel 2

Main Kitchen Sink Board
Main Kitchen Sink Board

Getting There

I was able to finish up the face setup for the top drawers. I put the Main Board on top of the counter and screwed it in. Now it’s time to make the hole for the sink.

Sink Hole
Sink Hole

Once the hole for the sink was cut, I started to think about the small pieces of metal that support the frame of the sink.

Double Cast Iron Sink
Double Cast Iron Sink

My wife was thinking that we should use a jack to set the sink in place once the cement is almost dry.  Were not 100% sure but we are going to keep trying.
Thanks for reading!

Semper Fidelis,

Manuel Perez

Advertisements

Kitchen Remodel

Brazilian Tile Back Splash
Brazilian Tile Back Splash

First half of kitchen done.  Just finished sealing the tile.  We have to wait 30 days until the cement cures and then we can seal it.

Brazilian Tile Back Splash
Brazilian Tile Back Splash
Metal Frame Around Tile
Metal Frame Around Tile
20 AMP Power Outlets
20 AMP Power Outlets
Cement Counter Tops and Brazilian Tile
Cement Counter Tops and Brazilian Tile
Removed Kitchen Counter and Old Back Splash
Removed Kitchen Counter and Old Back Splash

Removed the old counter on the kitchen sink side.

Who Took the Sink?
Who Took the Sink?
RainSoft Reverse Osmosis System
RainSoft Reverse Osmosis System

RainSoft Reverse Osmosis system.

Electrical all done.

Found that our valves were leaking, so we replaced them.

Valves fixed and added electrical for the garbage disposal.  (Yeah, I know, its really close to the water.)

Cement board added for back splash.

How much support do you recommend is needed to support the cement and the really heavy kitchen sink?

Thank you for the help.